Work Order for Battery replacement process
Business has a situation where they want to perform Battery replacement for Assembly parts.
Requirement is Assembly parts have batteries which will be replaced. Both Assembly and Battery are LOT & SERIAL controlled.
After the work order completion, Assembly will be in new LOT which should be the LOT of the battery.
To achieve this, I have tested NON-Standard work order process.
- Created Standard operation.
- At the time of creating Non-Standard WO: selected the standard operation and selected the battery (component) manually as item.
- At the time of work order execution, the component is issued out of existing location and LOT and the on hand stock too reduced.
Tagged:
0