Is any way can we load multiple data loads at same time for same period with different integrations?
Summary:
there is any way that we can load multiple data loads at the same time for same period with different integrations? The reason for asking is we have a business requirements to perform the daily reconciliations for almost all the source systems in the bank. How are we going to handle the scheduling if we must run serially one after another?
Content (please ensure you mask any confidential information):
Version (include the version you are using, if applicable):
24.08
Code Snippet (add any code snippets that support your topic, if applicable):
0