Can we use GOP to select warehouse based on shortest lead time
Summary:
We have created a zone (west) and we have two orgs (org A & org B)
The transit times have been defined from Org A(DC) to zone and Org B(mfg) to Zone
where org B transit time is less than that of org A
We have created a global sourcing rule (transfer from Org A & transfer from Org B ) 50% allocation for both and Rank 1 for both.
Assignment set is defined at region level
There are 2 local sourcing rules as well 1 for make at org B and the other one to transfer from Org B to Org A .
transit time is defined from Org B to org A
Tagged:
0