Production Schedule Changeover time based on Tool used on Machine
Summary:
We have a requirement to have changeover times in Production Schedule based on Tool Change on the same machine when a work order operation is being performed. Have defined tool based attribute in Manufacturing attribute( Work Defn Operation DFF) and have defined changeover times. However dont see any changeover being honored
Content (please ensure you mask any confidential information):
We have defined Tool based Attribute Changeover rules. But I don't see any changeover time is being honored when a work order operation is shifted from one tool to another. Is there a way to achieve it.
Version (include the version you are using, if applicable):
Tagged: