How are work order costs calculated for Co-Products in Discrete Manufacturing using actual Costing
Work Order is created with input material and resource (say having total input costs of $100). We define a primary output and one co-product during work order creation, co-product has a cost allocation of 40 % and the costing method is actual.
Does cost allocation for co-products feature work in an actual costing scenario ?
If yes, then how will we be able to configure the application to achieve output product costing as below -
Primary product cost - $60
Co-product cost - $ 40
Any help will be appreciated.
Thanks,
Mugdha Tilwe