How are work order costs calculated for Co-Products in Discrete Manufacturing using actual Costing

Work Order is created with input material and resource (say having total input costs of $100). We define a primary output and one co-product during work order creation, co-product has a cost allocation of 40 % and the costing method is actual.

Does cost allocation for co-products feature work in an actual costing scenario ?

If yes, then how will we be able to configure the application to achieve output product costing as below -

Primary product cost - $60

Co-product cost - $ 40

Any help will be appreciated.