Planned orders in Production Scheduling are getting clubbed at end of Resource Constraint Horizon
Summary:
We are using the capability of integrating Supply Plan with Production Scheduling. The planned orders within the resource constraint horizon days are getting scheduled considering resource constraint. However, all planned orders beyond the Resource Constraint Horizon days are getting clubbed to start immediately after the end of resource constraint horizon days. This is creating problem in supply planning and creating Resource overload since all planned orders are scheduled to start on same day (i.e. end of resource constraint horizon days)
Attached file shows the details of issue along with screenshots.
Ideally, the planned orders beyond the resource constraint horizon days should be left untouched with their dates.