Exist a procedure of Production to test copy in CPQ similar to the Fusion P2T?
Summary:
I've facing trouble to migrate to ptoduction some configurations that I made on my CPQ test site and I'm thinking to remake some configurations manually and after do a production to test copy to maintain the two site syncronyze.
Content (please ensure you mask any confidential information):
I ask this question because I realize that the objects stay identicated with the same ID, and it mean that if I remake those configuration directly to the production site it will be created with another ID breaking a possibility of in future updates the use of the migration feature because of the ID difference, but this issue can be solved if the procedure of Production to test copy are offer by Oracle, because I can put the production site to work remaking those objects that I can't migrate and after this I ask to do the P2T and the