Updated KIT BOM Refresh for an Open Sales Order
The KIT structure is finalized after the Order is created from Quote. Here is an example of the process:
1. Create a Quote for KIT A, which includes Item A, Item B, and Item C.
2. Submit the Quote.
3. The Quote is then converted into a Sales Order through integration.
4. A Sales Order Line is created for KIT A, with the included items as Item A, Item B, and Item C.
5. Afterward, the BOM structure in PIM is modified. Item C is removed, and Item 1 is added. The new Item Structure becomes Item A, Item B, and Item 1.
6. However, the Sales Order Line does not reflect the updated structure.
Tagged:
0