Integration Pipeline process failed for power user to load data from Planning to FCCS
Summary:
Content (please ensure you mask any confidential information):
Hi all
We have an issue were a power user set to be a proxy user so they should be able to load data using pipelines from Planning to FCCS is not able to load data. The pipeline fails with a generic error: Pipeline process stopped based on status "On Failure" setting.
I set the log level to 5, but could only see this error.
Can someone let me know if this task is failing due to other factors rather than the user being a power user?
thank you
Version (include the version you are using, if applicable):
Tagged:
0