Extra date on EXPECTED_DELIVERY_DATE from INV_SUPPLY Table
Summary:
an attempt is being made to create a report for material in transit. for all the PO in trasit.
using the table INV_SUPPLY
the table documentation indicates the following.
EXPECTED_DELIVERY_DATE Expected delivery date (receipt Date + post-processing lead time for MFG) |
where it indicates that the PP time will be taken into consideration for this field.
The value es 0.
any other idea why for certain items it adds up to 1 or two days when in the meantime it has 0 in all the inventory organization set up. is it a PO value?
if on the other hand a value is placed.
Tagged: