How to Mass Update Tolerances for Existing Project /award Budgets

Summary:

Hello everyone,

I would like to inquire about a process for mass updating tolerances for all our existing project budgets. Currently, all budget control flavors are set up with an "Absolute" control at the Project + Award Level, with a 50% tolerance. The goal is to reduce this 50% tolerance to a lower percentage.

Given that we have over 800 projects, manually creating baseline versions with updated tolerances is not a feasible solution. I have also looked into FBDI, but I couldn’t locate any option related to updating tolerances.

Questions:

  • Is there any way to perform a mass update or upload to change the tolerance values across all projects?