Adding the Output of a Previous Operation as Input in Another Operation of the Same Work Definition
Here is the requirement
We want to use the output of a previous operation 10 as input for the next operation- 20 within the same Work Definition.
We are receiving the below error when are trying to create process Work Order
This constraint we are facing in process manufacturing. Is there a way to configure this to allow for intermediate (output) items generated in one operation that can be consumed in the subsequent operation within a single cylce, that leads to final Output? any workarounds or changes done configurations can address this issue?
When Output 29013_P of Operation 10 in SNAP1 is being added as input item in Operation 20 below Error message is received (SNAP2)