Prebuild irrespective of Resource Load
Summary:
For a constrained Plan if the resource is getting overloaded, the planning process applies capacity constraints in a specific order.
- Prebuild in earlier time buckets
- Offload to an alternate resource
- Overload capacity
Our requirement is that the prebuild should happen irrespective of the available resource capacity. This will allow planners to prebuild when spare capacity is available at an earlier time. As I remember, there was a profile option in ASCP which could be used for this. Is there any option available in Fusion Supply Planning to achieve this?