Is there any way production batches can be limited to a shift?
Summary:
There’s a production calendar which runs on three shifts, and each shift is eight hours long. The main point is that we want to link the batch size with the shift duration, and then make sure no more than one batch gets planned or executed per shift but where exactly is that mapped or controlled? Is there any way production batches can be limited to a shift?