"Match Approval Level", value at supplier site not defaulted in PO schedule
Summary:
Receipt routing is "Inspection required" at supplier site
Set Invoice match option "Order" , Match approval level "3 way" at supplier site
it accepts this combination at supplier site and to be selected automatically at PO schedule, but not accepted to be defaulted from supplier site to PO schedule
It's expected these values to be defaulted in PO schedule
Inspection required , PO , 3 way
but in PO the default values are
Inspection required , PO , 4 way
I need the values which added at supplier site to be defaulted as is at PO schedule. How can I achieve that?
Inspection required , PO , 3 way
The
Tagged:
0