Summary:

We have a scenario where we want to populate the Priority field on the work order whenever a planned order released by planning creates a work order through orchestration.

The Priority value is maintained at the Item Org attribute level as an EFF and we are trying to fetch that value and populate on the Work order at run time through the service mapping.

Content (please ensure you mask any confidential information):

The priority field is used by the manufacturing floor users to properly sequence Work orders that optimize the equipment setup and changeover times. Ideally this sequencing could be done in Production Scheduling but since that module is not in use, we are trying to implement this between orchestration and manufacturing.