SP duplicate Planner order when refresh data form PS
I have try to work with SP and PS but I have some issue I send a example
Collection
SP Run (1)
PS Run (1)
Collection
SP Run (2)
When I run SP (2) show 2 planned orders 4998 + 1002 (with resoult PS) but create other planned order with the sum of them this is an incorrect planner order.
am I doing some incorrectly?
Thanks a lot
María.
Tagged:
0