How does Oracle connect Operation 10 output with OSP Item in OSP flow?
Hello everyone,
We are currently implementing an Outside Processing (OSP) flow in Oracle Fusion Cloud Manufacturing and have a question regarding how Oracle relates the produced material from an internal operation to the Outside Processing Item used in the Supplier Operation.
Here is the process we are trying to configure:
- We create a Work Order for a finished good (for example, a steel component for gas cylinders).
- We perform Operation 10, which is an internal manufacturing step where we prepare the steel that will later be sent to a subcontractor.
- We issue the materials through Pick Materials and Confirm Pick Slips
Tagged:
0