Load Budget at period child level and verify control at parent on yearly basis
Summary:
Hi,
Wanted to understand a scenario to load budget at child account level for specific periods, but also to have control checked at parent level for the entire year. Let us know how to can be achieved.
I created 2 control budget linking them with source budget type. One defined on yearly basis with Tree hierarchy attached, but receiving error-'The start date of the period 1-24 must be within the period range Jul-24 - Jun-26 of control budget LAWA Control budget. (XCC-675276)'
Content (please ensure you mask any confidential information):
Version (include the version you are using, if applicable):
Tagged: