Oracle's position on concurrent integrations?
Does anyone know what Oracle's position is on running multiple loads at once?
Can you pull from different cubes within the same EPBCS Applications at the same time with different target application URLs (e.g going from different cubes of EPBCS in a single URL into various applications with various URLs)
Can you load to the same application and database at the same time coming in from different cubes in the same application? (e.g loading to single EPCM from 5 different EPBCS cubes)?
Can you load to different systems (URLs) from the same application at the same time? (e.g doing multiple loads from one database into another URL single database?