Loading Multiple (daily) Periods at once

Summary:

In PCF, we have a source (BIP Report) that has a start date en end date as paramter. Via Data Exchange (EPM) we pass the start and end period to that BIP report. It runs well, but the workbench contains

We load this data to the Daily Cube in PCF (OEP_DCSH).

When I run the integration:

START PERIOD: 01-09-2025 (Mapped to OEP_Day244 via period mapping)
END PERIOD : 07-09-2025 (Mapped to OEP_Day250 via period mapping)

In each workbech, all the days apprear (1 until 7), instead we need the workbench for Sep 1th to show only the data from that date. So 7 different workbenches only containing the data of that day.