Modelling Dock Scheduling for Resource Management at a stop
Summary:
I have a requirement to associate specific resources with a shipment or a shipment stop. For example, a shipment should have a worker and equipment such as a crane assigned for unloading. Is there a way to model this requirement using Dock Scheduling?
Content (please ensure you mask any confidential information):
Dear Experts,
I am trying to model a dock scheduling scenario where specific resources need to be allocated at a particular shipment stop. For example, at a given location I have driver and supervisor resources created (D1, D2, S1, S2). In dock scheduling, I want to book two slots for drivers only.
0