Substitute Items vs Alternate Components in BOM – Planning and Work Order Behavior
Hi everyone,
In Oracle Fusion SCM, we identified two different substitution concepts:
- Substitute Items defined at item level (PIM – Item Relationships), including the Planning Enabled checkbox
- Alternate Components defined directly in the Bill of Material
We would like to clarify the following:
1. Planning perspective
- Which type of substitution is actually considered by Supply Planning?
- Is it correct that only Substitute Items at item level (with Planning Enabled) are used by planning, while Alternate Components in the BOM are ignored by planning?
2. Execution / Work Order perspective
When a Work Order is created and the primary component has no on-hand stock but a valid substitute exists with available stock: