Oracle Integration Gen 3 — Scheduled integrations: concurrency/limits and ways to increase?
Summary:
OIC GEN 3 Scheduled Integration Limitation
Content (please ensure you mask any confidential information):
I’m looking for clarity on how scheduled integrations are handled in Oracle Integration Generation 3 (OIC Gen 3), specifically:
- What are the current limitations for scheduled integrations (number of enabled schedules, concurrency, and overlap behavior)?
- How many scheduled integrations can actually start at the same time/minute?
- If there are limits, are there supported ways to increase them (configuration, instance sizing, or Support-requested changes)?
Version (include the version you are using, if applicable):
Oracle Integration Cloud Gen 3
Code Snippet (add any code snippets that support your topic, if applicable):
Tagged: