Production scheduling attribute sequencing logic
Summary:
For a scheduling bucket = 7, and the attribute sequence cycle as "Restart" how does the sequencing of work orders work based on the need by date for the below setup?
Sequence: SeqA , SeqB, SeqC
Cycle: Restart
Anchor date : 02-Feb-2026 , Rolling
Scenario1: Scheduling bucket is 7 days (02-Feb-2026 to 08-Feb-2026)
Group all the Work orders which have their need by date within the mentioned scheduling bucket. Sequence such that all work orders with Seq1 are scheduled first, then all WO with SeqB scheduled, finally all WOs with SeqC scheduled irrespective of the Need by date. Restart the sequence on the next bucket which is from 09-Feb