Dynamic Work Schedule Assignment

We need to manage employee schedules in HCM. The schedules to be managed have the following characteristics:

• Dynamic schedules that can change weekly

• The source of the schedules would not be HCM, but an external system or systems; we want the schedules to be uploaded to HCM via an integration that uploads them in bulk

• Shifts, days off, start times, end times, meal breaks, and rest breaks have a high degree of variation and tend to differ significantly between employees.

Given the above characteristics, do you think it's feasible to manage schedules in HCM using the Work Schedule Assignment functionality?