Adjust shipment cost - Audit action
When a user attempts to add a new shipment cost with accessorial code = "A", the system must validate both (1) specific shipment statuses and (2) the required shipment event. The shipment cost should be saved only if both conditions are satisfied. If either condition is not met, the system must prevent the save operation and display the error message that is configured in the Action Check Cause.
The audit action “Adjust shipment costs” has been assigned, and an allow condition has been configured. However, despite this configuration, the system still permits the shipment cost to be saved.
Is the audit action “Adjust shipment costs” appropriate for this scenario? If not, please recommend the correct audit action to use.
Tagged:
0