ERROR_INVALID_PERIOD error while running the integration for FCCS to EPBCS
Summary:
Hi,
Data Integration is failing with ERROR_INVALID_PERIOD. It will pull the data from FCCS to EPBCS.
The period mapping looks good. The same integration is working in production. But when we test this in test environment it's failing with the invalid period error. The EPBCS application is imported with the latest PROD snapshot. The period mapping is same in both PROD and TEST instance.
Could you please help with what could be the issue and how to resolve it?
Version (include the version you are using, if applicable):
Test instance: 26.06.73
Prod instance : 26.05.66
Tagged:
0