For cost roll up, should the work definition output quantity be the same as the batch quantity?

Summary:

  • A Process Manufacturing work definition has 1000 pounds as the Batch Quantity.
  • The work definition has two outputs:
    • The primary item output quantity is 1000 pounds.
    • The additional item output quantity is 500 pounds.

Should the total output quantity match the batch quantity?

If so, is there a cost roll up impact if the total output quantity does not equal the batch quantity?


Content (please ensure you mask any confidential information):


Version (include the version you are using, if applicable):

26B


Code Snippet (add any code snippets that support your topic, if applicable):

Tagged: