For cost roll up, should the work definition output quantity be the same as the batch quantity?
Summary:
- A Process Manufacturing work definition has 1000 pounds as the Batch Quantity.
- The work definition has two outputs:
- The primary item output quantity is 1000 pounds.
- The additional item output quantity is 500 pounds.
Should the total output quantity match the batch quantity?
If so, is there a cost roll up impact if the total output quantity does not equal the batch quantity?
Content (please ensure you mask any confidential information):
Version (include the version you are using, if applicable):
26B