Are in-line WIP inspections calculating AQLs correctly?

Here are the steps I followed to generate an in-line WIP inspection for capturing critical characteristics based on a 0.01 AQL:

  1. Approved a WIP inspection plan with 2 characteristics and a level that has the following settings:
    1. ANSI/ASQC Z1.4 Standard
    2. Single Sampling Plan for Normal Inspection
    3. General Inspection Level II
    4. AQL of 0.01
  2. Created a process manufacturing work order for 10 KG batch output.
  3. Inspection triggers for the operation and lists -1,240 pending and 1,250 accepted.