Are in-line WIP inspections calculating AQLs correctly?
in Quality
Here are the steps I followed to generate an in-line WIP inspection for capturing critical characteristics based on a 0.01 AQL:
- Approved a WIP inspection plan with 2 characteristics and a level that has the following settings:
- ANSI/ASQC Z1.4 Standard
- Single Sampling Plan for Normal Inspection
- General Inspection Level II
- AQL of 0.01
- Created a process manufacturing work order for 10 KG batch output.
- Inspection triggers for the operation and lists -1,240 pending and 1,250 accepted.