How to get the Work center Overhead calculated when there is multiple work definitions for same item
Summary:
We have a requirement to apply the overhead rate based on tonnage, where tonnage represent through the work center.
but the issue here is , same item has multiple work definitions with different work centers where the rollup is considering the value at costing priority 1 work definition.
Let say Item01, has multiple item structures like primary, Alternate 1,Alternate 2,Alternate 3…Alternate 6.
Item>Item Structure>Work center>Work definition
Item01 >Primary> WC1>WD1
Item01>Alternate 1> WC2>WD2
Item01>Alternate 2> WC3>WD3
for WC2 the tonnage is 220 ,which needs 0.5 $
for WC3 the tonnage is 240, which needs 0.8 $
We did the work center level overhead setup and it is not working as expected.