An existing published standard cost was used even though a sourcing rule exists for this item.
in Costing
Summary:
Hi Team, We are facing an issue on the Cost rollup. We have 7 levels of BOM and each stage has work definitions and proper sourcing rules to rollup the item cost till the Top level item. When we rollup the the cost by creating Cost Scenario with "Supply Chain Cost Rollup Flag" as Yes and by adding top level item as the rollup scope, we are seeing cost is not getting rolled up in all the levels. For stage 3 item we are getting below message
"An existing published standard cost was used even though a sourcing rule exists for this item."