WIP Attachments flowing thru to PO
Is there a way to have an attachment from either the Routing or Bill of Materials attached to a PO from an OSP operation?
I know the attachments flow through to the discrete job. Not sure if its possible to then have those attachments then attach to the PO raise from an OSP operation.
Regards,
Ruben
0