OPM Ingredient costs required?
In addition, operating costs (such as electricity, depreciation) is only calculated at the end of a month. Which means that the cost is no realised until then. At this time, the cost is entered as a fixed single-level cost. Costs are not broken down into the different resource and overhead costs. So essentially all operating costs are added together and divided by the tonnage of product produced.