Phantom engineering bom does not be explode to work order
I am in EBS R12, I Have a Bom like below
A -> Manufacturing BOM
|
B -> Engineering BOM
|
C -> component
When I create work order for assembly A, the component C is not picked. If I chage the BOM B to manufacturing BOM, then the work order is okay.
My profile "WIP:See Engineering Items" is set to "Yes" at site level only.
In my old EBS R11, this work fine.
Do I have any new config have to set in R12?
A -> Manufacturing BOM
|
B -> Engineering BOM
|
C -> component
When I create work order for assembly A, the component C is not picked. If I chage the BOM B to manufacturing BOM, then the work order is okay.
My profile "WIP:See Engineering Items" is set to "Yes" at site level only.
In my old EBS R11, this work fine.
Do I have any new config have to set in R12?
0