Release 11.5.10 and minimal Patch Requirements in November 2010
Hello All,
as all of you should be aware, the Release 11.5.10 is going into the 'Extended Support' Period in November 2010, there are some needed Pre-Requirements defined to be in the supported Status. Please see Note 883202.1 - 'Minimum Baseline Patch Requirements for Extended Support on Oracle E-Business Suite 11.5.10' and ensure, that your Release 11.5.10 Installations are patched to these Requirements in the next 10 months, to have your Instance to the needed Patchlevel requested by Development.
Thanks and best regards
RZiegler - Moderator