Simultaneous Operations
I have operations that are part of different departments that start at the same time but can finish at different times. If I create two operations within a Routing (10 - Build Widget and 20 - Build Shipping Box), op # 20 does not start until op # 10 has completed. If I make them sequences for the same operation, then I will lose resource capacity visibility by department. How do I have operations start at the same time?
0