Daylight Savings Time Issues with Grid Control Scheduled Jobs?
Schedule jobs in Grid Control think daylight savings ended last Sunday. Or did I miss a "critical update".
Although my jobs say "PST" they are all running as if it were "PDT".
Is there anything I can do to fix this?
Thanks - JR
p.s. I'm running GC 10.2.0.5 on an Oracle instance 10.1.0.4.
0