Using Multiple Cost Centres with 1 Project
I want to be able to setup a project to be able to use multiple cost centres. Currently, the cost centre is linked through a lookup table associating one project organisation to one cost centre which is a severe limitation in the use of Project Accounting. Is it possible to link 1 project for use with many cost centres and if so, how?