Time needed for SNO Plan Run in integrated version
We have 419 items out of which 200 are raw materials, 65 orgs, 800 sourcing rule lines, 4000 assignment set lines. We have launched the SNO plan with Solve in server as No. The model extraction time is roughly 2000 seconds but the plan is still running for more than 15 hrs. Any idea on how much time it should take?
Thanks
Sandeep