Oracle Weblogic Server (MOSC)

MOSC Banner

concern on changing the physical path mount point on the weblogic installation of a symlink location

edited Apr 27, 2011 10:34PM in Oracle Weblogic Server (MOSC) 1 commentAnswered
 As for our current Weblogic 11g (10.3.3.0) installation and setup, we have installed the weblogic binary software on 2 different servers on the "symbol link path", which the symlink point to the same NFS volume with corresponding  "server<xxx>" path.  At this time, this design is fine with the basic HA on the one NFS.   To take a step further to reduce the possible of failure on a single NFS volume,  we would like to separate the weblogic binary/domain path to 2 different NFS volume (eg: volume1 and volume2).    
    current setup:
    Mount point (NFS volume):  (volume1) /rel/ps/preprod/app/server<XXX>

Howdy, Stranger!

Log In

To view full details, sign in to My Oracle Support Community.

Register

Don't have a My Oracle Support Community account? Click here to get started.

Category Leaderboard

Top contributors this month

New to My Oracle Support Community? Visit our Welcome Center

MOSC Help Center