Overtime in Project Costing
We are implementing Oracle Project costing 11.5.10.2 for our client. I have done the following setup to enable overtime -
- Checked the check box in the Expenditure tab of implementation options enabling overtime calculation
- Setup the expenditure type with the expenditure type class for the overtime
- Defined the cost multiplier for the overtime
- Attached the overtime cost multiplier to the labor cost rule
- Defined a seperate task for overtime in the project
After setting up the above setups, defined a pre-approved timecard expenditure batch with 40 hrs time entered to the regular task of the project and overtime hours entered against the overtime task of the project, submitted and released the expenditure batch.