Simultaneous Resources in Routing Operation
Two resources are assigned to an Operation (Machine and Labor). These two machines work simultaneously to perform theoperation.
Routing setup:
In Operation resources window resoruces are defined as bellow
seq resources code Basis Rate schedule seq number schedule Flag
10 Machine Item 1 10 Yes
20 Labor Item 1 10 Yes
When creating a job and running ascp planning these resources are scheduled in series instead of being simultaneous reosurces.
Somebody told me about profile option! Any update on this issue.