How to create one Asset with multiple distribution lines (multiple Fund Codes)
Below are the steps that are followed.
1) I’ve Defined Asset through Project Costing System.
2) Associated Project & Activity for that Asset.
3) While Assigning Transaction Cost, I need to assign 2 transaction cost. Reason:- After fund distribution(split) in Project Costing system, ACTUAL transaction from Accounts Payable (of $100) gets distributed(split) into two transactions with Analysis Type ‘FND’ in ratio of 80:20. Hence ACTUAL transaction is broken into two Cost Transaction
Transaction-1 (amount $80) associated to Fund Code F1(Fedral)