Primavera P6 - Assign Baselines
I assign primary/secondary baselines to projects and summarize the data to ensure it is loaded in the database. Why is it that when other users open/print the projects the baselines I have assigned to the project aren't there? The user has to re-select the baselines so that reports are printing with the correct data.
0