Cycle Count
In the Cycle count setup on the Adjustment and ABC, there is a field Approval Required. In that if i set it up as It out of Tolerance, should i be entering the Tolerance (Quatity Variance or Adjustment Value or Hit/Miss Analysis field)? If i do not enter wont the system default to 0 value?
Thanks
Jay