Cannot Transfer WIP Issue Cost to Projects - Overhead Subelement
I have an issue with a WIP issue entered with Project information when I try to transfer the costs to projects.
When I checked the Material Transaction I realised that the Expenditure Type is in blank.
I think that can be due the subelements setup because the expenditure type assign to the WIP transactions will be taken from the subelements.
I have setup an expenditure type for Material subelement and Resource subelement but I left in blank the Expenditure Type field when I setup the Overhead subelement.
Which subelement will the system use in a WIP issue to pick up the Expenditure Type? Is the Overhead Subelement?