How to report on material units?

edited Apr 5, 2012 3:51AM in Primavera (MOSC) 9 commentsAnswered ✓
Hi,
I am currently working on a project where progress is measured by the number of meters of pipe that has been constructed and was wondering if it is possible to report on this information as you can hours based resources.

I have created the pipe as a material resource (only way to have a units by meter rather than hours), but it is not possible to select "Material units" on the EPS or reporting levels be be able to show this information in dashboards etc. Is there any way which this information can be shown at the EPS or dashboards?