How to AutoPopulate Duration Field in Time Reporting
Hi,
When the Engineer is reporting his Start Time and End Time, how can we populate the Duration Field.
Currently the Engineer is manually entering the Duration Field. Can anyone please tell me how can i do it.
Thanks,
hari.
0