Periodic Actual Cost Worker - CSTPPINV.COST_INV_TXN:CSTPPCLM.LAYER_ID: layers inconsistency - Proces
Hi
Can anyone help me on this error
The log file:
+---------------------------------------------------------------------------+ Bills of Material: Version : 12.0.0 Copyright (c) 1979, 1999, Oracle Corporation. All rights reserved. CMCPAW module: Periodic Actual Cost Worker +---------------------------------------------------------------------------+ Current system time is 10-MAY-2012 15:05:42 +---------------------------------------------------------------------------+ debug_level = 6 CM_EXTENDED_DEBUG = 2 Parameter: cost method = 3 legal entity id = 23273 cost type id = 1001 period id = 34011 coost group id = 1021 proc. types = 2 proc. upto date = 2012/04/30 Start Validation Master Org id of 87 is validated UOM Control of 3 is validated Phases in process phase table are validated Previous period id of 32011 is validated Pac rates of 1001 is validated Complete
3